黄色大片免费在线观看,国产免费啪啪,在线亚洲欧洲,91视频男人的天堂,日韩在线播放一区,一级特黄录像播放,综合久久91

軟題庫 移動APP 掃碼下載APP 隨時隨地移動學習 培訓課程
試卷名稱 2011年上半年數(shù)據(jù)庫系統(tǒng)工程師考試上午真題試題(綜合知識)
考試中心《2011年上半年數(shù)據(jù)庫系統(tǒng)工程師考試上午真題試題(綜合知識)》在線考試
試卷年份2011年上半年
試題題型【單選題】
試題內(nèi)容

Ravi, like many project(1),had studied the waterfall model of softwaredevelopment as the primary software life-cycle(2).He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as(4).
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be(5)to the new problem.
A development process, even after tailoring, generally cannot handle change requests.To
accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
(1)
A.customers 
B.managers 
C.users 
D.administrators 
(2)
A.activity 
B.procedure 
C.process 
D.progress 
(3)
A.parts 
B.modules 
C.software 
D.a whole 
(4)
A.parts 
B.modules 
C.software 
D.a whole 
(5)
A.modified 
B.used 
C.suited 
D.tailored


相關試題

推薦文章
合作網(wǎng)站內(nèi)容