黄色大片免费在线观看,国产免费啪啪,在线亚洲欧洲,91视频男人的天堂,日韩在线播放一区,一级特黄录像播放,综合久久91

軟題庫 培訓(xùn)課程
試卷年份2017年下半年
試題題型【單選題】
試題內(nèi)容

Which three PERT variables are needed to calculate the expected activity duration?
A、 Expected, most likely, and realistiC.
B、 Most likely, optimistic, and pessimistiC.
C、 High, low, and medium.
D、 Medium, minimum, and most likely.


相關(guān)試題