信息系統(tǒng)項目管理師每日一練試題內(nèi)容(2020/3/3)
試題1: 以下關(guān)于投標文件送達的敘述,( )是錯誤的。
A.投標人必須按照招標文件規(guī)定的地點、在規(guī)定的時間內(nèi)送達投標文件
B.投遞投標書的方式最好是直接送達或委托代理人送達,以便獲得招標機構(gòu)已收到投標書的回執(zhí)
C.如果以郵寄方式送達的,投標人應(yīng)保證投標文件能夠在截止日期之前投遞即可
D.招標人收到標書以后應(yīng)當簽收,在開標前不得開啟
在項目進度控制中,( )不適合用于縮短活動工期。
A.準確確定項目進度的當前狀態(tài)
B.投入更多的資源
C.改進技術(shù)
D.縮減活動范圍
Which of the following statement related to PMO is not correct? ( )
A. The specific form, function, and structure of a PMO is dependent upon the needs of the organization that it supports.
B. One of the key features of a PMO is managing shared resources across all projects administered by the PMO.
C. The PMO focuses on the specified project objectives.
D. The PMO optimizes the use of shared organizational resources across all projects.
某部門有3個生產(chǎn)同類產(chǎn)品的工廠(產(chǎn)地),生產(chǎn)的產(chǎn)品由4個銷售點(銷地)出售,各工廠的生產(chǎn)量(單位:噸)、各銷售點的銷售量(單位:噸)以及各工廠到各銷售點的單位運價(百元/噸)示于表4中。
適當安排調(diào)運方案,最小總運費為( )
A、450
B、455
C、460
D、465
某公司在制定招標評分標準時,下列做法較合適的是()
A、對業(yè)績評定的標準是:好、不好
B、服務(wù)能力評定標準是:根據(jù)其通過ISO20000認證情況酌情打分
C、價格分采用低價優(yōu)先法計算
D、按照ISO9000認證情況,將質(zhì)量標準分為7個檔次
the following diagram is()network topology structure
A、bus
B、star
C、ring
D、tree
2017年7月8日,《國務(wù)院關(guān)于印發(fā)新一代人工智能發(fā)展規(guī)劃的通知》中涉及了人工智能的幾個基礎(chǔ)理論,其中,( )研究統(tǒng)計學習基礎(chǔ)理論、不確定性推理與決策、分布式學習與交互、隱私保護學習等學習理論和高效模型。
A、大數(shù)據(jù)智能理論
B、跨媒體感知計算理論
C、高級機器學習理論
D、群體智能理論
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |